The 10th warehouse site for leading 3rd party logistics company Kammac means the company can offer 1.9 million square foot of storage across its network of warehouses.
This latest warehouse in Runcorn initially is used to store NHS Track and Trace kits and with the available height in the building, Storage Equipment Companies were invited to tender to design, supply and install a new pallet racking system and reconfigure a section of existing racking.
Avanta UK Ltd successfully tendered for the work and having completed other pallet racking projects for Kammac and more widely in the 3PL sector could present a comprehensive track record of this type of work
The pallet racking proposed was 17.5m high and 19m high configured into a Very Narrow Aisle (Sometimes referred to as VNA) layout. This offered the client an additional (circa) 12,000 pallet spaces.
The installation took only 3 weeks and the manufacturing lead-time of the UK Manufactured racking took 6 to 8 weeks. Advantages of a locally sourced racking system includes the availability of spares for when and if the system needs adding to and / or reconfiguring.
Project Highlights
- VNA Racking
- 12,000 (Circa) Pallet Spaces
- 19M High System
- UK Manufactured System
Kammac has over 3.2 million square foot of warehousing facilities in the UK, specialising in contract logistics, warehousing, distribution, onsite logistics and contract packing.
To learn more about one of the leading third-party logistics providers in the UK, please visit kammac.com.
Related Projects
- 3PL Expands with Chambers of New Racking in New Premises
- Double Deep Pallet Racking Project
- Healthy Lines of Pallet Racking
- Large Pallet Racking Project For Leading Home Delivery Company
- Long Lane Racking Solution for AKW Global Logistics
- Over 20,000 Pallet Positions Created For Trafford Park, Manchester Warehouse By Avanta.
- Pallet Racking Project For Large Home Delivery Specialist











