Warehouse Storage Equipment Project
Avanta UK Ltd successfully tendered for the project to equip the warehouse with storage equipment. The project involved the design, delivery and installation of: -
Adjustable Pallet Racking - to store circa 2000 1 tonne pallets. The pallet racking was installed in a narrow aisle configuration for articulated fork trucks and supplied with appropriate rack end barriers, anti-collapse mesh and rack load notices.
Fire Rated Mezzanine Floor - 355 square metre platform x 3.5m finished floor height. The fire rating of the mezzanine floor involved fitting a full area suspended ceiling and 28 galvanised finish column casings.
Longspan Shelving - 50 bays of longspan shelving with mesh decks and dividers for box storage sited on the ground floor under the mezzanine.
Steel Shortspan Warehouse Shelving - 128 bays of steel shelving, each bay measures 1200mm in width x 600mm depth. Each bay has 7 levels (including dust cover) with each level offering a 100KG (UDL) capacity. The shelving was configured into runs on the first floor of the mezzanine.
Working closely with the client and handling equipment provider, Avanta designed a cost effective warehouse storage system to store 2000 pallets and 2500 boxes thus optimising the storage capacity of the building.
The installation took 4 weeks to complete as agreed in the project plan.
Comment from Avanta - "This was a great project for us in terms of the equipment required, site location and the fact that it was a clear site with great access. This type of turn-key project is ideal as it covers a range of storage solutions all project managed by Avanta."
Related Projects
- One Company, Two Sites = Two Storage Solutions From Avanta UK
- Raising Hair Tools Storage Capacity
- Turnkey Storage Solution for Leading Worldwide Supply Chain Specialist
- Avanta Complete Multi-Storage Equipment For Yorkshire Based Febi Bilstein
- Elland’s Exertis Advent Rise To The Challenge With Multi-tier Mezzanine