Storage Equipment Fit Out Project For Lockwood Group

Lockwood Group have had a new 110,000sq ft warehouse purpose built in Denby to add to their existing 7 UK Sites. The Group is a family run business and currently has over 280 employees and activities include UK haulage and storage, frozen food production and commercial vehicle maintenance.

High Density Pallet Racking
Fire Rated Two Tier Mezzanine

Leeds based Storage Equipment Specialist Avanta UK Ltd worked closely with the Lockwood team and Handling Equipment Specialists to optimise the pallet storage of the new Grade A Warehousing Facility.

Top level of mezzanine floor
Empty narrow aisle racking to be loaded

The project included: -

  • Pallet Racking - Arranged in a very narrow aisle configuration to 13 metres high giving a storage capacity of circa 24,000 pallets to store a combination of Euro and UK pallets
  • Mezzanine Floor - Two tier fire rated mezzanine floor giving circa 1000 square metres of additional storage space. Access is via a utility and general access staircases. Pallet access is via 4 pallet gates.
  • Protective Barriers and Upright Protectors
  • Pallet Location Labels
Narrow aisle racking part loaded
Warehouse Mezzanine Floor

Lockwood Haulage are one of the UK's leading logistics providers. They have a large diverse fleet, with cost effective, quality, sustainable logistics solutions. Lockwood sites are in excellent locations to serve the whole of the UK and beyond on a same-day or next day basis.

With the addition of this excellent new facility Lockwood are in the perfect position to deliver on their client promise.

Specialists in supplying commercial storage solutions including pallet racking in Leeds and throughout the UK, Avanta UK Ltd offers a full office and warehouse interior design and installation service. We offer a free Site Survey and CAD Design and Consultancy Service, responding promptly to your enquiries.

Fire Rated Warehouse Mezzanine
Pallet Racking
Beam locking connection
Locker room with lockers and bench
New Canteen Facility