Avanta Warehouse Storage Equipment Project – Background
Avanta UK Ltd, the Leeds-based storage equipment specialist has secured and delivered a large-scale turnkey warehouse pick and store facility for the Meldrum Group on behalf of J. Barbour & Sons Ltd.
Meldrum Construction Services Group – Principal Contractor
The Meldrum Group is an innovative Northeast based company offering a fully integrated service; from planning and designing, to the civil engineering and construction of the project. This coupled with the Facilities Management services means Meldrum can take care of a finished building with a planned and reactive maintenance support service, giving clients complete peace of mind throughout the lifecycle of their assets and building.
J. Barbour & Sons Ltd. – End User Client
Barbour & Sons Ltd is an English luxury and lifestyle brand founded by John Barbour in 1894 that designs, manufactures and markets waxed cotton outerwear, ready-to-wear, footwear and accessories under the Barbour and Barbour International brands.
The company has been based in South Shields since founded and occupies numerous buildings, offices, warehouses, and factory shops within a relatively small footprint on the same industrial estate creating and sustaining local employment opportunities.
Brand Drives the Growth
The growth in popularity around the world for the Barbour brand and the opportunities of multi-channel routes to service all markets fuelled the requirement for greater storage capacity.
The new warehouse extension would not only increase storage capacity but also improve operations on site with the faster movement of clothing in and out of the estate. Once the project is complete there will be the creation of 20 additional full-time jobs.
Meldrum Group successfully tendered for the build of a 5,500 square metre warehouse extension offering full M&E fit out and CDM of the site. Creating a superb, fully equipped, and ready to use warehouse facility for the end user client. From the groundworks to the civils, to the electrics – Meldrum provided the full solution.
As work commenced on the build by Meldrum, Avanta UK worked closely with Barbour on the theme of maximising the storage space of the new warehouse – The available floor space and more importantly – The cube “top to bottom, left to right & front to back”.
The Storage Solution
To store multiple size boxes with personnel access to each box – A multi-tiered Rack supported structure with walkways and mezzanine floors was the proposed solution. This gave Barbour:
- 78M x 58M – Ground plus 3x Walkway Levels
- Finished Floor Levels – 2770, 5,490 & 8,210mm
- Circa 15,000 square metres of storage
- 4700 levels of picking, the equivalent of:
- 84,000 (circa) BDCM1 Retail Boxes if boxes employed were uniform
Selected Details
3 Tier Storage and Picking Structure constructed from Heavy Duty Pallet Racking with Mesh Decks, incorporating.
Mezzanine Floors
2x 3 Tier Mezzanine Floors – Fire Rated
1x Single Level Mezzanine Floor – Fire Rated
Mezzanine floors within the structure created marshalling areas and space for pick and pack operations.
Pallet Racking
10 to 11M high heavy-duty pallet racking with timber decked walkways supported by secondary support steels. Each shelf level incorporated a chrome wire mesh deck shelf support.
Access Throughout the Structure
Person access to each level was achieved by constructing 4x fire enclosed staircases with access to each floor level of the structure at multiple points.
2x Pedestrian / Goods lifts
Goods can be transported around the structure via 2x conveyor systems and 4x spiral chutes.
Pallets can be deposited on to floor levels via the 4x pallet gates supplied.
Safety Considerations Included
Smoke Baffle – Avanta designed, supplied, and installed a non-load bearing plywood cover roof supported via 47x47mm Unistrut construction. This was to the top of level 2 to reduce the sprinkler requirement at roof level and satisfy Part B escape regulations.
Fire Enclosed Staircases – For safe pedestrian access to all levels of the structure.
Handrail – Fitted to exposed edges of the structure.
Anti-collapse Mesh – to arrest the fall of boxes to exposed edges.
Netting – Also installed in certain edge areas.
Timescales
Working closely with the Principal Contractor – Meldrum Group, a critical path for the main phase of works was agreed. This was to ensure zones, aisles of the main structure were to be handed over for the mechanical & electrical teams to follow.
The final phase was to fit the mesh decks to each location once all services were in place.
Avanta provided site supervision throughout the duration of the project of multiple trade teams.
Comments
Avanta – “It has been a pleasure to work with the team at Meldrum Group on behalf of Barbour. The Meldrum team are very professional, organised, and efficient at delivering projects of this scale. To create this multi-level structure for a brand with such rich heritage has been extremely pleasing.
Further Product Information
What is a Pick Tower / Multi-tier Shelving?
These systems are a cost-effective alternative to mezzanine floors or extending the warehouse facility or relocation.
Multi-tier shelving floor (Also known as a picking tower) is a free-standing structure, that it is designed to provide storage to all levels of the structure, within the same footprint. This storage system is also known as a rack supported structure and they are used to improve picking efficiency and maximising storage capacity. This is achieved by utilising the available height in the warehouse.
The structure utilises double or multiple height shelving (Can be shortspan or Longspan) or pallet racking with steel angels to support the flooring materials (Could be chipboard, steel etc) to create walkways and steel staircases to provide access to all products. A self-supporting structure with 100% accessibility.
Benefits of a Multi-tier Shelving
The system is cost effective as it reduces the requirement for large structural steels as the strength is from the shelving / racking structure. Also, you can maximise the storage height and headroom within the structure as there is not the requirement for large beam supports – a thin line structure.
Related Projects
- END to End Storage With Large Multi-Tier Shelving Solution
- Multi-level Storage Solution for Fastest Growing Workwear Retailer
- Large-Scale Multi-Level Mezzanine Floor Extension Project
- Major Multi-tier Mezzanine Floor Project Completed by Avanta UK
- Avanta Create 40,000 Pallet Locations for Global Retailer of Apparel and Home Fashions
- 3PL Expands with Chambers of New Racking in New Premises
- Healthy Lines of Pallet Racking
- Large Pallet Racking Project For Leading Home Delivery Company
- Avanta Two by Two Tier Fire Rated Mezzanine Floor Project