Six-Tier Mezzanine for Automated Fulfilment

Avanta UK has designed and installed a six-tier mezzanine structure for one of the UK’s largest multichannel retailers.

Creating approximately 11,000m² of operational space inside an existing distribution facility – without extending the building.

Five decked floors provide the working areas for an automated fulfilment operation. A sixth-level steel framework, at around 23m, carries the suspended conveyor track that links them. Avanta acted as Principal Contractor throughout, including the piling works, and completed the installation in 24 weeks.

Completed six-tier mezzanine structure in a distribution warehouse
11,000m²operational space
6 tiersrising to approx. 23m
345 tonnesstructural steelwork
90 minspassive fire protection
24 weeksinstallation programme

The Challenge: Using the Full Height of the Building

The client needed a substantial amount of additional capacity for an automated fulfilment operation, but within the footprint of an existing warehouse. The answer was to build upwards, making use of almost the full internal height of the building.

Conveyor track also had to run above the working floors. Rather than hanging it from the roof or from the floors below, the design included a dedicated top tier whose sole purpose is to carry the conveyor system.

Tall multi-tier warehouse mezzanine floor
Six-tier mezzanine floor construction in progress
Mezzanine steel columns during installation

Five Operational Floors Plus a Conveyor Support Level

The first five tiers are decked mezzanine floors forming the main operational areas, finished with foil-backed mezzanine boards and a high-build epoxy coating. Each level was designed to suit its intended use:

  • Levels 1–4: 5kN/m²
  • Level 5: 3.5kN/m²
  • Sixth-level conveyor support framework: 1.5kN/m²

The sixth tier is not a working floor. It is a structural framework that supports the conveyor track around 23m above the warehouse floor, and it forms an integral part of the automated system.

Multi-tier mezzanine floor under construction
Mezzanine floor level before boarding
Structural steelwork for six-tier mezzanine
Six-tier mezzanine during construction

Designed Around Automation

The structure was designed together with the client’s warehouse automation rather than adapted to it afterwards. Conveyor loads and support positions were built into the structural design from the outset.

Pocket conveyors and roller conveyors connect the floors, moving inbound stock and outbound orders vertically through the building, while the areas below remain clear for storage, picking and handling.

Planning a multi-tier mezzanine or automation project? Request a mezzanine floor quotation or contact our team.

Supporting steelwork for high-level conveyor
Hanging system for suspended conveyor track

Steelwork, Piling and 90-Minute Fire Protection

Around 345 tonnes of structural steelwork were used across the five floors and the upper framework. The scale, weight and height of the structure required careful coordination, including the piling works needed to support it.

The complete structure received 90 minutes of passive fire protection, with intumescent paint applied to all four sides of the steelwork – including the sixth-level conveyor framework.

As Principal Contractor, Avanta managed the piling, steelwork, decking, floor finishes and fire protection as one coordinated programme, giving the client a single point of responsibility.

Mezzanine floor cut-out trim detail
Perimeter mesh on mezzanine floor edge

Project Highlights

  • Client: One of the UK’s largest multichannel retailers
  • Project: Six-tier mezzanine structure for warehouse automation
  • Operational area: Approximately 11,000m²
  • Structure: Five decked floors plus a conveyor support level
  • Overall height: Approximately 23m
  • Design loadings: 5kN/m² (levels 1–4), 3.5kN/m² (level 5), 1.5kN/m² (sixth level)
  • Structural steelwork: Approximately 345 tonnes
  • Decking and finish: Foil-backed mezzanine boards with high-build epoxy coating
  • Fire protection: 90-minute intumescent coating to all four sides of the steelwork
  • Automation: Inbound and outbound pocket and roller conveyors
  • Associated works: Piling
  • Programme: 24 weeks
  • Avanta’s role: Principal Contractor
Mezzanine floor level with epoxy finish
Operational mezzanine level

The Result

The retailer now has approximately 11,000m² of connected operational space, plus the structure its automation depends on, all within the existing building. The project shows how the full height of a warehouse can be turned into a multi-level fulfilment operation.

Need more space without moving or extending? Explore our mezzanine floors or request a quotation.