Avanta UK has designed and installed a six-tier mezzanine structure for one of the UK’s largest multichannel retailers.
Creating approximately 11,000m² of operational space inside an existing distribution facility – without extending the building.
Five decked floors provide the working areas for an automated fulfilment operation. A sixth-level steel framework, at around 23m, carries the suspended conveyor track that links them. Avanta acted as Principal Contractor throughout, including the piling works, and completed the installation in 24 weeks.
The Challenge: Using the Full Height of the Building
The client needed a substantial amount of additional capacity for an automated fulfilment operation, but within the footprint of an existing warehouse. The answer was to build upwards, making use of almost the full internal height of the building.
Conveyor track also had to run above the working floors. Rather than hanging it from the roof or from the floors below, the design included a dedicated top tier whose sole purpose is to carry the conveyor system.
Five Operational Floors Plus a Conveyor Support Level
The first five tiers are decked mezzanine floors forming the main operational areas, finished with foil-backed mezzanine boards and a high-build epoxy coating. Each level was designed to suit its intended use:
- Levels 1–4: 5kN/m²
- Level 5: 3.5kN/m²
- Sixth-level conveyor support framework: 1.5kN/m²
The sixth tier is not a working floor. It is a structural framework that supports the conveyor track around 23m above the warehouse floor, and it forms an integral part of the automated system.
Designed Around Automation
The structure was designed together with the client’s warehouse automation rather than adapted to it afterwards. Conveyor loads and support positions were built into the structural design from the outset.
Pocket conveyors and roller conveyors connect the floors, moving inbound stock and outbound orders vertically through the building, while the areas below remain clear for storage, picking and handling.
Planning a multi-tier mezzanine or automation project? Request a mezzanine floor quotation or contact our team.
Steelwork, Piling and 90-Minute Fire Protection
Around 345 tonnes of structural steelwork were used across the five floors and the upper framework. The scale, weight and height of the structure required careful coordination, including the piling works needed to support it.
The complete structure received 90 minutes of passive fire protection, with intumescent paint applied to all four sides of the steelwork – including the sixth-level conveyor framework.
As Principal Contractor, Avanta managed the piling, steelwork, decking, floor finishes and fire protection as one coordinated programme, giving the client a single point of responsibility.
Project Highlights
- Client: One of the UK’s largest multichannel retailers
- Project: Six-tier mezzanine structure for warehouse automation
- Operational area: Approximately 11,000m²
- Structure: Five decked floors plus a conveyor support level
- Overall height: Approximately 23m
- Design loadings: 5kN/m² (levels 1–4), 3.5kN/m² (level 5), 1.5kN/m² (sixth level)
- Structural steelwork: Approximately 345 tonnes
- Decking and finish: Foil-backed mezzanine boards with high-build epoxy coating
- Fire protection: 90-minute intumescent coating to all four sides of the steelwork
- Automation: Inbound and outbound pocket and roller conveyors
- Associated works: Piling
- Programme: 24 weeks
- Avanta’s role: Principal Contractor
The Result
The retailer now has approximately 11,000m² of connected operational space, plus the structure its automation depends on, all within the existing building. The project shows how the full height of a warehouse can be turned into a multi-level fulfilment operation.
Need more space without moving or extending? Explore our mezzanine floors or request a quotation.
Downloads
Media Gallery
Related Projects
View all projects →-
15,000m² Mezzanine Floor Built for Future Growth
View project →
-
The Latest Mezzanine Floor Production from Avanta UK
View project →
-
Avanta Create Automation Platform for Next Plc
View project →
-
Multi-Level Picking Structure for Iconic Heritage Brand
View project →
-
Turnkey Multi-tier Mezzanine Floor Project for Multi-channel Fashion Retailer
View project →
-
Large-Scale Multi-Level Mezzanine Floor Extension Project
View project →
-
Major Multi-tier Mezzanine Floor Project Completed by Avanta UK
View project →