15,000m² Mezzanine Floor Built for Future Growth

Avanta UK has designed and installed a large-scale mezzanine floor for a major UK multichannel retailer.

Creating approximately 15,000m² of additional operational space on top of an existing mezzanine level – without extending the warehouse.

The new timber-decked floor sits approximately 5m above an existing concrete mezzanine, making use of the building’s available height. Avanta acted as Principal Contractor and delivered the project in three phases over a 25-week programme.

Completed 15,000m² mezzanine floor with Robot Floor coating
15,000m²additional space
6kN/m²deck loading
20,500mezzanine boards
60 minsintumescent fire protection
25 weeksthree-phase programme

The Challenge: Planning Ahead for Growth

The mezzanine had always been part of the client’s long-term plan for the facility. When the warehouse extension was built, the floor slab and structural column connections were designed to take a future mezzanine – but the floor itself was held back until the extra capacity was needed.

When additional storage and picking space was required, the planned mezzanine could go ahead without another building extension or a move to new premises.

New mezzanine level overlooking the warehouse
Warehouse shelving and picking on the new mezzanine floor
BDC shelving and Pallite picking units on the mezzanine

A Double-Boarded Timber Deck

Approximately 14,700m² of the floor was finished with a double-boarded timber deck, using around 20,500 individual mezzanine boards.

  • Deck loading: 6kN/m²
  • Deflection: L/400 across the complete floor
  • Height: Approximately 5m above the existing concrete mezzanine

The deck provides a robust working surface for the client’s initial storage and order-picking operation, while the stiffness of the L/400 design suits the areas prepared for future automated pallet shuttles.

Double-boarded timber mezzanine deck
Robot Floor coating being applied to the mezzanine deck

Ready for Automation and a Further Level

Support steelwork for future automated pallet shuttle systems was built in during the main programme, so automation can be introduced later without major alterations to the finished floor.

The approved structural design also allows for a third level, approximately 5m above the new floor. Column stubs extend around 500mm above the finished deck, ready to take the additional columns when that capacity is needed.

Planning for future growth? Request a mezzanine floor quotation or contact our team.

Column stubs ready for a future mezzanine level
Robot Floor coated mezzanine deck

Floor Finish, Fire Protection and Phased Delivery

The timber deck received two coats of Robot Floor flexible coating, to a combined nominal thickness of 0.6mm. It gives a sealed, consistent surface now, and a specialist Robot Floor resin system can be applied directly over it later without removing the existing finish.

The steelwork received 60-minute intumescent fire protection, applied on site as part of the build.

As Principal Contractor, Avanta managed health and safety, trade coordination and the three construction phases, releasing completed sections progressively and giving the client a single point of responsibility.

Storage mezzanine level with Pallite picking units
Mezzanine column and Pallite picking units

Project Highlights

  • Client: Major UK multichannel retailer
  • Project: Large-scale mezzanine floor on an existing concrete mezzanine
  • Mezzanine area: Approximately 15,000m²
  • Deck: Double-boarded timber, approximately 14,700m² (around 20,500 boards)
  • Height: Approximately 5m above the existing mezzanine
  • Deck loading: 6kN/m²
  • Deflection: L/400 across the complete floor
  • Floor finish: Two coats of Robot Floor flexible coating (0.6mm nominal)
  • Fire protection: 60-minute intumescent paint, applied on site
  • Future-proofing: Support steelwork for automated pallet shuttles and approved provision for a further 5m level
  • Initial use: Stock storage and order picking, with relocated BDC shelving and new Pallite picking units
  • Programme: 25 weeks, in three phases
  • Avanta’s role: Designer, supplier, installer and Principal Contractor
Runs of pick faces on the warehouse mezzanine
Temporary Pallite pick faces on the mezzanine floor

The Result

The retailer now has approximately 15,000m² of additional storage and picking space, with the structure already prepared for automation and a further level. Planning for the floor when the warehouse was extended meant the extra capacity could be added exactly when it was needed.