From receipt of your mezzanine floor enquiry you will be allocated an account manager who will be your sole contact for the initial stages of the mezzanine floor quotation. They will base costing on a detailed site survey and will provide you with a detailed proposal including CAD designs. If the quotation is acceptable, the following procedure will take place.

Detailed Site Survey – Includes detailed measures and site assessment.Storage Mezzanine Floor
Mezzanine Floor Design – Our design team will use industry standard CAD software to design the floor.
Site Specific Drawing – This drawing is to be signed off and amendments can not be made after this point without incurring additional charges.
Submit a Building Regulations Request to the Local Authority for Certification. Avanta UK Ltd will take full responsibility for obtaining all building control and fire regulation requirements.

At this stage the account manager will hand the project to a dedicated contracts manager.Storage Mezzanine Floor c/w Shelving
Commence and complete Mezzanine Floor manufacture to BS5950
Deliver to site at pre-agreed date whereby the site is deemed ready to accept delivery and installation of the mezzanine floor. For example, access is clear for delivery, fork trucks are on site etc.
Installation of Mezzanine Floor in line with CDM & HSE guidelines. The Avanta installation team is fully accredited and trained in the installation of mezzanine floors. However the client has the option of installing their own mezzanine floor.
Handover to client on pre-arranged date after sign off.