The company was looking to relocate one of its existing sites in Birstall to a larger modern and high specification facility in a location that offers direct access on to the national motorway network to service the Yorkshire region.

To maximize storage in the new warehouse Avanta UK Ltd was appointed to design, supply and install the new pallet racking and relocate existing shelving originally supplied by Avanta.

The scope of works included supplying new pallet racking to accommodate 900 pallets @ 1000mm wide x 1200mm deep and up to 1800mm high with 1000kgs load.

From taking delivery at a specific pre booked slot the installation took 2.5 days to complete.

Avanta Comment: –
“We were delighted to win this new pallet racking contract. The client wanted a UK made new racking system where spares, modifications and support are part of the package. We completed the works on time and to budget.”