www.avantauk.com 19 Latest Mezzanine Production from Avanta UK Introduction: An industry-leading technical services company recently relocated to a new facility at a prominent UK studio complex. With a vast inventory of heavy specialist equipment, the client required a significant increase in storage capacity to support its operations. Project Overview: Working alongside a global real estate consultancy, the client identified a mezzanine floor installation as the most effective solution. This flexible infrastructure allows for future adaptability and supports evolving operational needs. Mezzanine Floor Details: A mezzanine floor and intermediate level between main floors was chosen for its ability to maximize vertical space without altering the building’s footprint. Its relocatable nature also supports long-term flexibility and lease compliance. Project Award: Following a competitive tender process, Avanta UK Ltd was selected to deliver the project. With a tight lead time and complex requirements, Avanta’s experience in turnkey storage solutionsmade themthe ideal partner. Avanta’s Turnkey Solution Included: • Mezzanine Floor: A 2,000 square meter fire-rated mezzanine, standing 5.2m to finished floor level and 4.7m clear underneath ideal for pallet racking and large equipment storage. • Access: Three staircases for personnel and a vertical goods lift plus pallet gate for load access. • Fire Rating: One-hour fire rating achieved through fascia, column casings, a suspended ceiling, and two fire lobbies. • Lighting & Electrical Installation: A premium electrical system featuring Thorlux intelligent lighting, high-efficiency LED fittings with daylight harvesting and presence detection, and emergency lighting compliant with CIBSE standards. Power distribution was tailored to the facility’s operational needs. • Floor Protection: Heavy-duty 2.5mm industrial vinyl specified by the real estate consultancy to protect the mezzanine deck. • Pallet Racking: Avanta designed, supplied, and installed British-manufactured adjustable pallet racking to match existing systems, with configurations up to 4m high. • Additional Works: Included Armco barrier and column protection, and relocation of existing racking. Project Management: Avanta UK acted as Principal Contractor for the 12-week project, managing all Health & Safety responsibilities and maintaining a constant site management presence to ensure smooth delivery.
RkJQdWJsaXNoZXIy MjQxNjM=