Cool Refurbs

Cool Refurbs

Avanta UK have recently completed a full refurbishment of a 30,000 square foot industrial unit for ICS Cool Energy on the popular Euroway Trading Estate in Bradford. ICS Cool Energy is the marketleading £50m temperature control solutions specialist. The company has out grown the current Bradford set up and needed to relocate to larger premises.

Room For Inspiration

Room For Inspiration

Project to convert a standard meeting room into an Inspiration / Innovation Room for one of Europe’s fastest growing manufacturers creating a collaborative workspace for colleagues and clients to promote free thinking that could ultimately result in new product ideas.

Double up Mezzanine and Cantilever Racking Project in Leeds Bradford

Double up Mezzanine and Cantilever Racking Project in Leeds Bradford

The scope of the project included the design, supply and installation of 2 fire rated mezzanine floors and long run of heavy duty cantilever racking to store long heavy parts. The project also included the re-configuration of the existing pallet racking.

Office Partitions Bradford

Avanta UK Ltd are based in Leeds approximately 15 miles from Bradford. Our office partitioning fixers and sales team are based locally which means that we can respond quickly and our prices will be competitive. The office partitioning range from Avanta is extensive and includes solid and glazed variants with a range of acoustic performance […]

Multi-tier Mezzanine Floor & Shelving Project For GROUPAUTO

Multi-tier Mezzanine Floor & Shelving Project For GROUPAUTO

Leeds based Storage Equipment specialist Avanta UK Ltd has completed a large scale turnkey project for Cleckheaton based GROUPAUTO. Having previously designed and installed the warehouse interiors for the likes automotive part manufacturers Febi Bilstein, Federal Mogul and Borg Warner Turbos it was felt that Avanta had the right credentials to tender for the project. […]

Fire Rated Mezzanine Floor & Office Fit Out For Bradford Based Advanced Dynamics

Fire Rated Mezzanine Floor & Office Fit Out For Bradford Based Advanced Dynamics

Due to increased demand Advanced Dynamics Ltd, the Bradford based specialist supplier of fully integrated and bespoke feeding systems, labelling equipment and wrapping machinery contacted a selection of companies in Yorkshire with a potential mezzanine project.

Widespan Fire Rated Mezzanine Install in Bradford

Widespan Fire Rated Mezzanine Install in Bradford

Leeds based Avanta UK Ltd successfully tendered for a large fire rated mezzanine floor installation in Bradford for a leading packaging company. The new mezzanine floor measures 254 square metres (21 x 12.1m) with a finished floor level of some 5.133 metres to match an existing floor.

Large Warehouse Mezzanine Floor Installation West Yorkshire

Large Warehouse Mezzanine Floor Installation West Yorkshire

This particular retail warehouse operation handles all it’s UK returns and rather than have the logistical nightmare and potential downtime of relocation decided that a large scale mezzanine floor would increase capacity without causing any disruption to the day to day running of the business.

Large Mezzanine Floor Installation in Bradford

Large Mezzanine Floor Installation in Bradford

Below is an example of a large scale mezzanine floor installation in Bradford for one of the UK’s foremost multichannel retailers. Avanta UK also manufactured and fitted all the framework for the garment hanging systems for the top deck.  The design included cut outs for conveyors 3 access staircases.

Anti-Static Workbenches – West Yorkshire Electronics Company

Anti-Static Workbenches – West Yorkshire Electronics Company

Working closely with the client Avanta UK designed and supplied: –
12 off Cantilever assembly workbenches with antistatic worktops, electrical service ducts, with a combination back panel.
36 off Heavy duty test workbenches with antistatic worktops. All the workbenches were supplied built up so that they were ready to use. The benches were manufactured and supplied within the required 4 weeks.

The customer commented: – “I have been impressed with the response from Avanta to my enquiry. They suggested the benches be supplied built up to minimize the installation costs and the salesman even helped off load the wagon for us.”

0
Connecting
Please wait...
Send us a message

Sorry, we aren't online at the moment. Please leave us a message.

Your name
* Email
* How can we help?
Online Chat

Need more help? Save time by starting your request online.

* Your name
* Email
* How can we help?
We're online!
Feedback

Help us help you better! Feel free to leave us any additional feedback.

How do you rate our support?