Client – Electrical & Automation Energy Saving
Location – Leeds, West Yorkshire
Project – Production Team Office Suite Build

In April 2013, Avanta UK successfully tendered to supply and build office partitioning, a suspended ceiling, lighting, air conditioning, floor coverings and furniture to form an office suite within a production area.
The partitioning system put forward was Komfire 75 which is a 50mm steel stud and 2x 12.5mm plasterboard construction surrounded by an aluminium framework . The system test ratings for fire and sound are 30 minutes and 43 dB (Rw) respectively.
Additional protection and sound proofing was provided by bonding plasisol faced steel sheet to the plasterboard on the exterior side.  All partitions were finished 100mm PVC skirting.

The office suite built is 21.5m in length x 9m wide x 2.7m high.  The suite consisted: –
4x Managers Offices – with additional meeting table, desk chairs and storage
1x Main Production Office subdivided into 3 with 1500mm high 600 series screens to accommodate 4 people per office
1x Meeting Area divided by fabric folding partition with 24dB sound rating to be used as required
1x Utility Area

The solid partitions were decorated in the Tektura matt range of vinyl wall coverings and the 9 single doors are oak veneered with vision panels.
Within the office structure there are 30 double glazed modules with 20 having integral blinds.

The suspended ceiling contained 600mm square edge tiles with 100mm insulation under the facia.  Within the grid there are 52 600mm CAT2 flourescent lights.
The installation including 5 wall and 2 ceiling mounted units and the flooring was heavy duty contract carpet tile.

Overall the full installation took 4 weeks to complete as planned.

Avanta commented “We love projects like this.  Great regular local customer who required exactly what we do – a full turn key factory office installation.  We have created a functional yet attractive working environment for the production managers and it is great to see the finished job after all the work we have put in.

Avanta UK Ltd of Leeds do not just build offices we also offer Racking, Shelving and Mezzanines on a Nationwide basis all backed with our free no obligation survey and quotation service.

Image Gallery

Office Partitions in Leeds Bradford
Folding Office Partition
Komfire 75 to Create Production Office Suite
0
Connecting
Please wait...
Send us a message

Sorry, we aren't online at the moment. Please leave us a message.

Your name
* Email
* How can we help?
Online Chat

Need more help? Save time by starting your request online.

* Your name
* Email
* How can we help?
We're online!
Feedback

Help us help you better! Feel free to leave us any additional feedback.

How do you rate our support?